Project 110 - Large Infinity Star Ceiling.

Starscape was contacted by M18 Lanes - a bowling alley and lounge in Stanmore, north London, and asked to supply and install around 170m2 of Infinity panels. As we’re based in North Northumberland travelling anywhere to install usually involves the best part of a day’s travel in each direction, so it's not a service we can normally offer.

In this case however we made an exception, and took the opportunity to record the process.

Infinity track

Workshop manager David demonstrating our Infinity steel track.

Room before

The space to fill with stars. This is very different to the home cinema environment which is the
main market for the Infinity system.

First section of track

The first length of steel mounting track in place.

Martin installing the tracking

Technician Martin working on track installation.

Track with fibre optic tails

A good photo showing the steel channel with the fibre optic carrier tails threaded through the access
holes. These pairs of holes also provide anchor locations for the safety tethers on the rear of the
panel, and of course can be used by speaker or other cables.


More track

Lots of carrier tails. These will connect to the shorter tails at the back of each panel in due course.

Panel cut-out needed

We had to make provision for Air Conditioning units, downlights, fire alarms, columns and
numerous other fittings.


Some panels installed

It's always nice to work with the light sources turned on.

More panels and tails installed

Here and there you can see bright spots of light dangling beneath the ceiling. These are the
ends of feeder tails, ready for connection to their respective panels.


Panels with cut-outs

Stars and downlighters

The diagonal line running from left to right in the top half of the image is where there was a
change in ceiling height. The edges of the panels here were fitted with an optional black edge trim.


Work in progress

The downlighters in this area are also fibre optics, but instead of single fibres each fitting is
illuminated by dozens of fibres.


About half way through the installation

 

Air conditioning units to cut around

 

More panels installed

 

Only a ferw panels left to do.

 

M18 lanes star panels

 

Almost finished

 


Other trades were still working when we left so a ‘finished’ photo was not possible.

However, M18 Lanes are commissioning some professional photos so WATCH THIS SPACE.

 

 

 





 

 

Back to Projects

Delivery

Orders under £30.00 are usually delivered by Royal Mail first class. Please allow up to 5 days for delivery.
Over £30.00 delivery is by next working day courier. For Saturday deliveries there's a £20.00 surcharge.

For our customers' complete peace of mind Starscape’s online credit card transactions are handled by HSBC bank. The shopping cart (Roman Cart) is verified by VeriSign, and should you wish to complete your purchase over the phone we have computer systems and card information handling procedures verified by Security Metrics.

Links to the latest projects:


Why not browse through some of our 100+ project pages for ideas and inspiration?

Bathroom fibre optic lighting

Project 91

Wildlife projects at Starscape:

Wildlife at Woodside

Often seen in the surrounding wood, these three deer ventured a lot closer.

Wildlife at Woodside.....Read more

Get in Touch

  • Phone:
    01289 332900
  • Email:
    info@starscape.co.uk
  • Address:

  • Woodside
    Scremerston
    Berwick-upon-Tweed
    Northumberland
    TD15 2SY
    United Kingdom